INTRO

Project Description

The Cobblestone Auto Spa located in Mesa, Arizona is currently under construction. Western Pump is building and installing the fuel system.

The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning.

DETAILS

Project Features

  • One (1) 15,000 Gallon Underground Storage Tank (UST) and One (1) 23,000 Gallon Underground Storage Tank (UST)
  • Six (6) Multi Product Dispensers (3+1 Blenders)
  • Four (4) turbine tank sumps
  • Underground Pipe Installation
  • Back Fill Tank and Pipe Excavation
  • Tank Monitoring System Equipment
  • Testing, Start-Up, and Commissioning
Procore
Procore

Services Provided

  • Saw cut, breakout, remove concrete
  • Tank Installation
  • Piping Installation
  • Fuel Dispenser Installation
  • Tank Monitoring System Upgrade
  • Drive Slab Installation
  • Flow Meter Calibration
  • Start-up & Initialization
  • Regulatory Inspections
  • Close-out Documentation