INTRO

Project Description

The Cobblestone Auto Spa located in San Tan, Arizona is currently under construction. Western Pump is building and installing the fuel system.

The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning.

Red gas tanks placed in a construction.

DETAILS

Project Features

  • One (1) 15,000 Gallon Underground Storage Tank (UST) and One (1) 23,000 Gallon Underground Storage Tank (UST)
  • Six (6) Multi Product Dispensers (3+1 Blenders)
  • Four (4) turbine tank sumps
  • Underground Pipe Installation
  • Back Fill Tank and Pipe Excavation
  • Tank Monitoring System Equipment
  • Testing, Start-Up, and Commissioning
Picture of a construction.
DCIM100MEDIADJI_0121.JPG
Construction with 2 red gas tanks placed underground.
DCIM100MEDIADJI_0112.JPG

Services Provided

  • Saw cut, breakout, remove concrete
  • Tank Installation
  • Piping Installation
  • Fuel Dispenser Installation
  • Tank Monitoring System Upgrade
  • Drive Slab Installation
  • Flow Meter Calibration
  • Start-up & Initialization
  • Regulatory Inspections
  • Close-out Documentation