Case Study
INTRO Project Description The QuikTrip Store 489 project, located in Casa Grande, Arizona was completed April 2022 and is now open. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning. DETAILS Project Features Five (5) 15,000 Gallon Underground Storage Tanks (UST) Five (5) single-walled, turbine tank sump Ten (10) Gilbarco Encore 700s Underground Pipe Installation…
INTRO Project Description The LEGOLAND Fuel Facility is located in Carlsbad, CA. The scope of work included the installation of an aboveground fuel system and fuel management system. DETAILS Project Features One (1) 4,000 Gallon Aboveground Storage Tank (AST) w/ tank top equipment Two (2) Tank Mounted Dispensers One (1) Retractable Hose Reel Two (2) Interstitial Leak Detectors Two (2) Level…
INTRO Project Description The Brown Field Border Patrol Station located in Dulzura, CA is in progress and nearing completion. The scope of work includes the installation of vehicle service equipment, an aboveground fuel system, fuel system electrical, and start-up and commissioning. DETAILS Project Features Three (3) 240-gallon Double-Wall UL-142 Oil Tanks One (1) 480-gallon Double-Wall UL-142 Oil Tank One (1) Waste…
INTRO Project Description The Brown Field Border Patrol Station located in Dulzura, CA is in progress and nearing completion. The scope of work includes the installation of vehicle service equipment, an aboveground fuel system, fuel system electrical, and start-up and commissioning. DETAILS Project Features Three (3) 240-gallon Double-Wall UL-142 Oil Tanks One (1) 480-gallon Double-Wall UL-142 Oil Tank One (1) Waste…
INTRO Project Description The QuikTrip Store located in Tolleson, Arizona had two (2) 13,000 gallon single-compartment diesel underground storage tanks added to its existing site away from the existing tank farm. The project was completed on July 23, 2021. The scope of work included demolition, excavation and trenching, a diesel tank addition, dispenser removal and installation, backfilling, tank monitor upgrades, fuel…
INTRO Project Description SeaWorld San Diego had an existing fuel system that needed updating. Western Pump removed one (1) 10,000 gallon UST system and replaced it with one (1) AB-2481 continuously monitored 10,000 gallon UST system with double wall sumps, product, vent, and vapor piping, electrical controls and monitoring. The project was completed March of 2021 and included demolition, underground tank…