INTRO
Project Description
Western Pump has completed a raze and rebuild of an older Love’s Travel Stop in Buckeye, AZ.
The project included excavation, trenching, backfill, fuel system installation, electrical testing, start-up, and commissioning, as well as lube equipment installation, testing, start-up, and commissioning.
DETAILS
Project Features
- Auto Fueling Area – One (1) 30,000-gallon regular unleaded single-compartment Underground Storage Tank (UST) and One (1) 20,000-gallon two-compartment Underground Storage Tank (UST) (12k Diesel / 8k Premium Unleaded Gasoline)
- Diesel Truck Fueling Area – One (1) 20,000-gallon single-compartment Underground Storage Tank (UST) (Diesel Exhaust Fluid), One (1) 6,000-gallon single-compartment Oil Water Separator and Four (4) 12,000-gallon UL-2085 Aboveground Storage Tanks
- Seven (7) Multi Product Dispensers (3+1 Blenders)
- Six (6) Master/Satellite + DEF Dispensers
- Four (4) turbine tank sumps
- Underground Pipe Installation
- Back Fill Tank and Pipe Excavation
- Tank Monitoring System Equipment
- Testing, Start-Up, and Commissioning
- One (1) owner provided Lube Tank
- Ten (10) medium pressure Oil Pumps
- One (1) Grease Pump
- One (1) Waste Oil Pump
- One (1) 10 Reel Mounting Bracket
Services Provided
- Saw cut, breakout, remove concrete
- Tank Installation
- Piping Installation
- Fuel Dispenser Installation
- Tank Monitoring System Upgrade
- Drive Slab Installation
- Flow Meter Calibration
- Lubrication System Installation
- Start-up & Initialization
- Regulatory Inspections
- Close-out Documentation