Uncategorized

QUIKTRIP 489 in Casa Grande, AZ – A Case Study

Western PumpFeb 22, 2022
Placing gas tanks.

The QuikTrip Store 489 project, located in Casa Grande, Arizona was completed April 2022 and is now open. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning.

Case Study: LEGOLAND Fuel Facility (Carlsbad, CA)

Western PumpFeb 15, 2022
LEGOLAND fuel facility.

The LEGOLAND Fuel Facility is located in Carlsbad, CA. The scope of work included the installation of an aboveground fuel system and fuel management system.

Analyzing Success: Brown Field Border Patrol Station in Dulzura, CA

Western PumpFeb 7, 2022
Gas station under construction.

The Brown Field Border Patrol Station located in Dulzura, CA is in progress and nearing completion. The scope of work includes the installation of vehicle service equipment, an aboveground fuel system, fuel system electrical, and start-up and commissioning.

Senate Bill #445 Storage Tank Regulation

Western PumpOct 19, 2021
3 gas tanks.

Underground Storage Tank Owners and Operators in the state of California will be faced with a difficult decision come December 31st, 2025. Senate Bill #445 requires single-walled tank owners and operators to permanently close or replace Underground Storage Tanks containing hazardous substances. Operators that refuse to make the changes needed to comply may be red-tagged by the Unified Program Agency (UPA)…

WESTERN PUMP acquires DOEHRMAN COMPANY, Inc.

Western PumpOct 1, 2021
Western pump + Doehrman company.

The hidden problem that could be hurting your business – dirty fuel. Our fuel system service experts have prepared this fuel system cleaning FAQ to help you learn more about this hidden problem and ways to correct it.

Insights into Quiktrip: Diesel Tank Installation in Chandler, AZ

Western PumpSep 17, 2021
Underground tank installation.

The QuikTrip Store located in Chandler, Arizona had two (2) 13,000 gallon single-compartment diesel underground storage tanks added to its existing site away from the existing tank farm. The scope of work included demolition, excavation and trenching, a diesel tank addition, dispenser removal and installation, backfilling, tank monitor upgrades, fuel system electrical, testing, start-up, and commissioning.