Blog
Underground Storage Tank Owners and Operators in the state of California will be faced with a difficult decision come December 31st, 2025. Senate Bill #445 requires single-walled tank owners and operators to permanently close or replace Underground Storage Tanks containing hazardous substances. Operators that refuse to make the changes needed to comply may be red-tagged by the Unified Program Agency (UPA)…
The hidden problem that could be hurting your business – dirty fuel. Our fuel system service experts have prepared this fuel system cleaning FAQ to help you learn more about this hidden problem and ways to correct it.
The QuikTrip Store located in Chandler, Arizona had two (2) 13,000 gallon single-compartment diesel underground storage tanks added to its existing site away from the existing tank farm. This site also had a full flex-pipe, re-boot, and re-pipe done for gasoline, premium, and diesel. The project was completed on in August of 2021. The scope of work included demolition, excavation and…
The QuikTrip Store located in Tolleson, Arizona had two (2) 13,000 gallon single-compartment diesel underground storage tanks added to its existing site away from the existing tank farm. The project was completed on July 23, 2021. The scope of work included demolition, excavation and trenching, a diesel tank addition, dispenser removal and installation, backfilling, tank monitor upgrades, fuel system electrical, testing,…
The QuikTrip Store located in Mesa, Arizona had a 13,000-gallon single-compartment diesel underground storage tank added to its existing site away from the existing tank farm. The project was completed on April 23rd, 2021. The scope of work included demolition, excavation and trenching, a diesel tank addition, dispenser removal and installation, backfilling, tank monitor upgrades, fuel system electrical, testing, start-up, and…
The QuikTrip Store located in Glendale, Arizona had two (2) 13,000 gallon single-compartment diesel underground storage tanks added to its existing site away from the existing tank farm. The project was completed on May 26th, 2021. The scope of work included demolition, excavation and trenching, a diesel tank addition, dispenser removal and installation, backfilling, tank monitor upgrades, fuel system electrical, testing,…





