INTRO

Project Description

Western Pump designed and built the Fuel Tank Storage and Dispensing System for this new facility. Project features include four (4) double-wall Fiberglass Underground Storage Tanks (3 x 30,000-gallon, 1 x 15,000-gallon), nine (9) double-wall fiberglass Piping Systems, twelve (12) Fuel Dispensers (24 fueling positions), one (1) Balance Phase-II Enhanced Vapor Recovery (EVR) System, one (1) 3-Terminal VeriFone Point-of-Sale (POS) System, and one (1) 8,832-s.f. Canopy Structure with LED fixtures.

DETAILS

Scope of Work

Design & Build

Fuel Storage & Dispensing System

Canopy Structure

Electrical

Services Provided

  • Design & Engineering
  • Permitting
  • Engineered Shoring
  • Excavation & Trenching
  • Tank Installation
  • Electrical Installation
  • Secondary Containment
  • Enhanced Leak Detection Testing
  • Piping System Installation
  • Enhanced Vapor Recovery (EVR)
  • Point-of-sale system installation
  • Compliance Testing
  • Inspections

Notable Accomplishment

We encountered existing hardpan, caliche, and cobbles during excavation (the geotechnical report did not indicate this). Western Pump worked with Haskell to mitigate the negative impacts on the project schedule and budget; this was accomplished by quickly securing additional heavy equipment and by negotiating a fair rate.

Testimonial

“Western Pump performed very well. They provided welcome expertise and guidance both on the technical elements as well as permitting. The work was completed safely and with a high-level of quality. Western Pump overcame some difficult site conditions and completed the work ahead of schedule. I look forward to the opportunity to work with them again.”