Loves gaas station.

Case Studies

Showcasing Excellence in Gas Station Construction Projects

Western Pump’s featured projects offer a glimpse into our latest achievements in the fueling and transportation infrastructure industry. Our detailed case studies highlight our expertise in general construction and gas station construction projects, providing insights into our innovative approaches and solutions. Explore our featured projects to understand how we’re shaping the future of the fueling and transportation infrastructure industry.

All
Arizona
California
Idaho
Washington
Picture of a gas tank.

Case Study: Sea World Underground Storage Tank Replacement (San Diego, CA)

Mar 30, 2021
SeaWorld San Diego had an existing fuel system that needed updating. Western Pump removed one (1) 10,000 gallon UST system and replaced it with one (1) AB-2481 continuously monitored 10,000 gallon UST system with double wall sumps, product, vent, and vapor piping, electrical controls and monitoring. The project was completed March of 2021 and included demolition, underground tank replacement, backfilling, dispenser replacement, fuel management installation, start-up and commissioning.
Picture of a construction.

LOVE’S TRAVEL STOP | BIO DIESEL FUEL SYSTEM (COACHELLA, CA)

Mar 16, 2021
The Love’s Travel Stop & Country Store located in Coachella, CA had a 20,000-gallon single-compartment Bio-Diesel Underground Storage Tank added to its existing tank farm. This project was completed on February 19th, 2021. The scope of work included demolition, excavation and trenching, Bio-Diesel Tank Add, Piping Addition, Diesel Tank Modifications, Backfilling, Tank Monitor Upgrade, Fuel System Electrical, Testing, Start-up, and Commissioning.
Gas station at night.

LOVE’S TRAVEL STOP & COUNTRY STORE (BLISS, ID)

Dec 18, 2020
The Love’s Travel Stop & Country Store located in Bliss, ID was completed and opened up its doors on December 17th. The scope of work included excavation and trenching, installation of the auto and diesel fueling areas, installation of the auto and diesel forecourt, all piping systems, installation of the monitoring system, all the fuel system electrical and testing, start-up, and commissioning of the site.
Gas station at night.

Case Study: Love’s Travel Stop & Country Store (Bliss, ID)

Dec 18, 2020
The Love’s Travel Stop & Country Store located in Bliss, ID was completed and opened up its doors on December 17th. The scope of work included excavation and trenching, installation of the auto and diesel fueling areas, installation of the auto and diesel forecourt, all piping systems, installation of the monitoring system, all the fuel system electrical and testing, start-up, and commissioning of the site.
Picture of a gas station.

LOVE’S TRAVEL STOP (BORON, CA)

Oct 26, 2020
The Love’s Travel Stop & Country Store located in Boron, CA was completed and opened up its doors on September 17th. The scope of work included excavation and trenching, installation of the auto and diesel fueling areas, installation of the auto and diesel forecourt, all piping systems, installation of the monitoring system, all the fuel system electrical, and testing, start-up, and commissioning of the site.
Picture of a gas station.

LOVE’S TRAVEL STOP (CORDES JUNCTION, AZ)

Oct 19, 2020
The Love’s Travel Stop & Country Store located in Cordes Junction, AZ was completed and opened up its doors on October 15th. The scope of work included excavation and trenching, installation of the auto and diesel fueling areas, installation of the auto and diesel forecourt, all piping systems, installation of the monitoring system, all the fuel system electrical, and testing, start-up, and commissioning of the site.
Picture of a gas station.

Case Study: Love’s Travel Stop & Country Store (Cordes Junction, AZ)

Oct 19, 2020
The Love’s Travel Stop & Country Store located in Cordes Junction, AZ was completed and opened up its doors on October 15th. The scope of work included excavation and trenching, installation of the auto and diesel fueling areas, installation of the auto and diesel forecourt, all piping systems, installation of the monitoring system, all the fuel system electrical, and testing, start-up, and commissioning of the site.
Picture of a gas tank.

DELUXE AUTO CARRIERS INC. (JURUPA VALLEY, CA)

Sep 1, 2020
The new Deluxe Auto Carriers located in Jurupa Valley, CA. Western Pump was selected to design and construct the Fueling Systems for this facility. Scope of work included all design, engineering, mechanical and electrical control systems for the installation of a commercial trucking fuel facility. Project included one (1) Aboveground Diesel Storage Tank, one (1) Aboveground DEF Storage Tank with piping and electrical under a 30’ x 57’ Cantilever Canopy.
Picture of a gas station.

PILOT FLYING J TRAVEL CENTER (BRAWLEY, CA)

Aug 28, 2020
The Pilot Flying J Fuel System Install was completed in January of 2019. Western Pump was selected to construct the Fueling Systems for this project. The scope of work included all mechanical and electrical control systems, conduits, and wiring for the installation of an auto and truck stop facility located in Brawley, CA. The project included the installation of two (2) Underground Storage Tanks (USTs) and four (4) Aboveground Storage Tanks (ASTs) with underground piping and electrical for (24) fuel positions under two canopies.