Western Pump’s featured projects offer a glimpse into our latest achievements in the fueling and transportation infrastructure industry. Our detailed case studies highlight our expertise in general construction and gas station construction projects, providing insights into our innovative approaches and solutions. Explore our featured projects to understand how we’re shaping the future of the fueling and transportation infrastructure industry.
-

LOVES TRAVEL STOP #280 RAZE AND REBUILD (BUCKEYE, AZ)
September 11, 2024Western Pump has completed a raze and rebuild of an older Love’s Travel Stop in Buckeye, AZ. The scope of work involved excavation, trenching, backfill, installation of the fuel system and its electrical testing, start-up, commissioning, as well as the installation, testing, start-up, and commissioning of lube equipment. -

COBBLESTONE AUTO SPA NO. 17 (MESA, AZ)
May 25, 2022The Cobblestone Auto Spa located in Mesa, Arizona is currently under construction. Western Pump is building and installing the fuel system. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning. -

COBBLESTONE AUTO SPA NO. 18 (SAN TAN, AZ)
May 18, 2022The Cobblestone Auto Spa located in San Tan, Arizona is currently under construction. Western Pump is building and installing the fuel system. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning. -

LOVES TRAVEL STOP (MOSES LAKE, WA)
May 9, 2022The Loves Travel Stop & Country Store located in Moses Lake, Washington was completed and opened its doors in April of 2022! Western Pump built and installed the fuel system. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning. -

QUIKTRIP 489 (CASA GRANDE, AZ)
May 4, 2022The QuikTrip Store 489 project, located in Casa Grande, Arizona was completed April 2022 and is now open. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning. -

LEGOLAND FUEL FACILITY (CARLSBAD, CA)
April 27, 2022The LEGOLAND Fuel Facility is located in Carlsbad, CA. The scope of work included the installation of an aboveground fuel system and fuel management system. -

Case Study: Brown Field Border Patrol Station (Dulzura, CA)
February 7, 2022The Brown Field Border Patrol Station located in Dulzura, CA is in progress and nearing completion. The scope of work includes the installation of vehicle service equipment, an aboveground fuel system, fuel system electrical, and start-up and commissioning. -

QUIKTRIP | SINGLE-COMPARTMENT DIESEL UNDERGROUND TANK INSTALLATION (CHANDLER, AZ)
September 17, 2021The QuikTrip Store located in Chandler, Arizona had two (2) 13,000 gallon single-compartment diesel underground storage tanks added to its existing site away from the existing tank farm. This site also had a full flex-pipe, re-boot, and re-pipe done for gasoline, premium, and diesel. The project was completed on in August of 2021. The scope of work included demolition, excavation and trenching, a diesel tank addition, a re-pipe and re-boot, dispenser removal and installation, backfilling, tank monitor upgrades, fuel system electrical, testing, start-up, and commissioning. -

QUIKTRIP | SINGLE-COMPARTMENT DIESEL UNDERGROUND TANK INSTALLATION (Tolleson, AZ)
July 26, 2021The QuikTrip Store located in Tolleson, Arizona had two (2) 13,000 gallon single-compartment diesel underground storage tanks added to its existing site away from the existing tank farm. The project was completed on July 23, 2021. The scope of work included demolition, excavation and trenching, a diesel tank addition, dispenser removal and installation, backfilling, tank monitor upgrades, fuel system electrical, testing, start-up, and commissioning.