Western Pump’s featured projects offer a glimpse into our latest achievements in the fueling and transportation infrastructure industry. Our detailed case studies highlight our expertise in general construction and gas station construction projects, providing insights into our innovative approaches and solutions. Explore our featured projects to understand how we’re shaping the future of the fueling and transportation infrastructure industry.

All
Arizona
California
Idaho
Washington
Twenty-Nine Palms Band of Mission Indians Tank Set

Twenty-Nine Palms Band of Mission Indians Tank Set

May 1, 2025
Western Pump was selected by the Twenty-Nine Palms Band of Mission Indians to construct one of the largest retail fueling facilities in Southern California. The project included the installation of a massive underground tank system totaling 248,000 gallons of fuel storage. Located in Coachella, California, this development marks a pivotal step in the Tribe’s long-term strategy for economic diversification beyond gaming.
Viejas Case Study - Western Pump

Viejas Travel Center (Alpine, CA)

Oct 6, 2024
The Viejas Travel Center in Alpine, California, is a state-of-the-art facility with an expanded fuel forecourt and a thoughtfully designed 6,000-square-foot C-store. This was a collaborative design/build effort on tribal lands.
LOVES TRAVEL STOP #280 RAZE AND REBUILD (BUCKEYE, AZ)

LOVES TRAVEL STOP #280 RAZE AND REBUILD (BUCKEYE, AZ)

Sep 11, 2024
Western Pump has completed a raze and rebuild of an older Love’s Travel Stop in Buckeye, AZ. The scope of work involved excavation, trenching, backfill, installation of the fuel system and its electrical testing, start-up, commissioning, as well as the installation, testing, start-up, and commissioning of lube equipment.
Picture of a construction and a gas tank.

COBBLESTONE AUTO SPA NO. 17 (MESA, AZ)

May 25, 2022
The Cobblestone Auto Spa located in Mesa, Arizona is currently under construction. Western Pump is building and installing the fuel system. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning.
Picture of a construction.

COBBLESTONE AUTO SPA NO. 18 (SAN TAN, AZ)

May 18, 2022
The Cobblestone Auto Spa located in San Tan, Arizona is currently under construction. Western Pump is building and installing the fuel system. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning.
Picture of a gas station under snow.

LOVES TRAVEL STOP (MOSES LAKE, WA)

May 9, 2022
The Loves Travel Stop & Country Store located in Moses Lake, Washington was completed and opened its doors in April of 2022! Western Pump built and installed the fuel system. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning.
Underground tank installation.

QUIKTRIP 489 (CASA GRANDE, AZ)

May 4, 2022
The QuikTrip Store 489 project, located in Casa Grande, Arizona was completed April 2022 and is now open. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning.
Gas tanks.

LEGOLAND FUEL FACILITY (CARLSBAD, CA)

Apr 27, 2022
The LEGOLAND Fuel Facility is located in Carlsbad, CA. The scope of work included the installation of an aboveground fuel system and fuel management system.
Placing gas tanks.

Case Study: QUIKTRIP 489 (Casa Grande, AZ)

Feb 22, 2022
The QuikTrip Store 489 project, located in Casa Grande, Arizona was completed April 2022 and is now open. The scope of work included excavation, trenching, backfill, fuel system installation, testing, start-up, and commissioning.