Western Pump completed Phase I of an underground storage tank (UST) replacement at the Dana Point Fuel Dock in Dana Point Marina. The project included the removal and installation of a fuel system and required extensive coordination, environmental compliance, and large-scale excavation within an active marina environment. The work was successfully completed in April 2026.

DETAILS

Project Details

  • Removal of six (6) existing underground storage tanks, including gasoline, diesel, bio-diesel, and waste oil systems
  • Installation of five (5) new double-wall USTs (up to 15,000 gallons each)
  • Use of a 150 ft crane to safely remove and install tanks, enabling efficient execution in a constrained marina setting
  • Excavation, shoring, and removal of over 2,100 tons of soil and existing site materials
  • Installation of new underground fuel piping, vent systems, and electrical infrastructure
  • Integration of a Veeder-Root TLS 450 Tank Monitoring System for advanced fuel management and leak detection
  • Full site restoration including concrete, asphalt, curbs, and accessibility improvements

Services Provided

  • UST removal, disposal, and replacement
  • Excavation, shoring, and site preparation
  • Underground piping and electrical installation
  • Tank monitoring system installation and calibration
  • Testing, inspections, and regulatory closeout